HD Awards 2025 - Shortlist Announced
Gascoigne West Phase 2

Gascoigne West Phase 2

Completed

Shortlisted

Planning Application Link View map

Number/street name:
Healey Street

Address line 2:

City:
London

Postcode:
IG11 7EW

Architect:
White Arkitekter

Architect contact number:
+44 7932690156


Developer:
London Borough of Barking & Dagenham/ Be First Regeneration.

Contractor:
Wates

Planning Authority:
London Borough of Barking and Dagenham

Planning consultant:
Be First Regeneration

Planning Reference:
(20/01675/FULL)

Date of Completion:
03/2025

Schedule of Accommodation:
99 x1B2P , 210 x2B4P, 77 x3B5P

Tenure Mix:
32% affordable rent 40% private rent 16% target rent 12% London affordable rent

Total number of homes:
386


Site size (hectares):
1,33

Net Density (homes per hectare):
290

Size of principal unit (sq m):
72.1

Smallest Unit (sq m):
51.4

Largest unit (sq m):
107

No of parking spaces:
36 (of which 14 are accessible)

Scheme PDF Download



Planning History

The project made changes to the outline planning permission obtained in 2018. The Client wanted to challenge the approved outline parameters, and the layout and scale of development was redesigned. A full application was submitted for Phase 2, and a S73 submitted for Phases 1, 2 and 3.
Three pre-application meetings were held. January 2020 focussed on massing and routes through and around the site. May 2020 addressed facades and landscape design. The third pre-app covered the design response to aspects raised at QRP, and GLA pre-app. A Secured by Design meeting was also held. (20/01675/FULL) was obtained on 22.02.2021.

The Design Process

The place offers a thriving community with its unique blend of modern development and strong local ties. The regeneration project includes modern, energy-efficient homes and improved public spaces, making it one of the greenest, most affordable neighbourhoods in London. 386 tenure-blind homes a mix of apartments and townhouses and a Community Hub and playground.

Clear wayfinding and courtyards framed by townhouses, connect to existing routes and strengthen pedestrian and cycle paths, creating a safe, well lit, green and accessible routes, active frontage. Clearly defined entrances with active frontages and pocket parks help wayfinding. The tall buildings acting as wayfinding elements with the 3-storey townhouses framing courtyards breaking down the scale, relating to the surrounding context. The strong coloured brick on the towers is a result of community engagement and places for girls workshops highlighting “more colour” in the design.

Community Hub and playground at the heart of the development, a series of public spaces for socialisation and play, shared courtyard gardens and balconies and private amenity space for all.

The considerate design provides a high ratio of dual aspect homes with generous layouts and ample daylight penetration.

The design is built upon existing amenities, with improved connections to the site and surrounding areas. Focus was to strengthen pedestrian and cyclist connection to Barking Town centre , only 10 min walk away.
The public realm embeds an inclusive ‘pedestrians first’ focus. Well-connected pedestrian and cycle routes are marked in different materials.

A series of clearly defined hierarchy of public squares, local greens, semi-private gardens, and private courtyards manage flood and storm water through swales and SuDS. Design developed to retain Cat A trees on the site.

Located near a primary school, local shops, and restaurants.

Bike storage and cycling infrastructure promote active travel. 36 on-street parking spaces, considered a car-free development.

Key Features

The Community Hub and playground at the heart of the development, boosting. community interaction helping to build pride in the neighbourhood.
Stakeholder engagement focused on inclusivity and was based on White Arkitekter’s ‘Places for Girls’ engagement programme.
The buildings are shaped to enable the retention of mature trees on St Pauls Road.
This relationship between the streetscape and landscape shapes strong frontages and entrance squares that repair the urban fabric.
The landscape manages flood and storm water including swales and extensive SuDS.
Efficient well-lit easy to use apartments in the towers, large family homes at lowest affordable rent in townhouses.

Download PDF

Scheme Information

Type

  • Multi-Aspect Apartments
  • Mansion Block
  • Terrace
  • Town house

Size

  • High rise
  • High density
  • Compact

Cost/ownership

  • Affordable
  • Council
  • Mixed Tenure
  • Mixed Use

Planning

  • Estate Regeneration
  • Community Consultation
  • Urban Regeneration

Construction/Design

  • Brickwork
  • Contemporary Design
  • Modern methods
  • Off-site

Sustainability

  • Biodiversity/Building with Nature
  • Low embodied carbon construction
  • Low Energy in Use
  • Sustainable urban Drainage Systems

Outdoor areas

  • Private Terraces
  • Outside Terrace
  • Biodiversity
  • Garden

Surrounding Area

  • Healthy Streets
  • Landscape
  • Communal Spaces
  • Community Buildings
  • Play Spaces
  • Public open space

Specialised

  • Wheelchair
  • Community

Sustainability

Carbon reduction on site (% reduction compared to Part L 2013) 40% • Consideration of passive design in building geometry and orientation. • Connect to Barking Town Centre District Heating Network, with 69% water source heat pumps in River Roding • Maximise renewable energy Roof coverage by solar panels /PVs 50 % • Energy efficiency specification, with specification enhancements that aim to meet updated GLA policies. Whole life-cycle carbon assessment, and embodied and operational carbon reduction options have been considered. Key mitigation measures include the optimisation of concrete structures, to use GGBS cement replacement, and the use of structural timber for construction of the townhouses. • Circular economy principles have been embedded into the designs in line with the Circular Economy Statement. • The transport strategy prioritises pedestrians and cyclists and there is no combustion on-site • The surface water / flood risk strategy incorporates sustainable urban drainage systems (SUDs) including biosolar roofs. • An Urban Greening Factor of 0.4 Biodiversity net gain % > 10% • The proposals consider daylighting for both the proposed scheme and neighbouring developments. • A detailed cut and fill exercise has been carried out to minimise excavation, vehicle movements and removal of material from site. • Water efficiency, waste and construction site impacts have been considered. There is a total of 732 secure bicycle parking spaces provided and 46 visitors spaces. The total reused/recycled content on site was 17.17%. Use of rain gardens to filter and slow surface run off provides a water source for plants within rain gardens All timber FSC certified 100% of demolition waste was recycled 100% excavation waste reused on site Reuse of existing paving on site 97% recycled content in steel 100% recycled rubber tyres used in rubber safety surface within landscaping; Concrete with 66% GGBS. 793 kgCO2/m2 for modules A1-A5 (excluding sequestered carbon). 403 kgCO2/m2 for modules B-C.
Next
Previous