HD Awards 2025 - Shortlist Announced
Yewbarrow

Yewbarrow

Project

Shortlisted

Planning Application Link View map

Number/street name:
Yewbarrow Lodge

Address line 2:
Main Street

City:
Grange-over-sands

Postcode:
LA116EB

Architect:
OMI Architects

Architect contact number:
01618323242


Developer:
South Lakes Housing.

Contractor:
(To be appointed)

Planning Authority:
South Lakeland District Council

Planning consultant:
Enabl

Planning Reference:
SL/2023/0467

Date of Completion:
04/2025

Schedule of Accommodation:
18 units in total - 9No. houses (4No. 2 Bedroom Houses, 5No. 3 Bedroom Houses) and 9No. apartments (5No. 1 Bedroom Apartments, 4No. 2 Bedroom Apartments)

Tenure Mix:
40% Shared Ownership, 60% Affordable rent

Total number of homes:
18


Site size (hectares):
0.425

Net Density (homes per hectare):
42.35

Size of principal unit (sq m):
102.6

Smallest Unit (sq m):
50.2

Largest unit (sq m):
102.6

No of parking spaces:
49

Scheme PDF Download



Planning History

The site lies within the Grange Over Sands Central Conservation Area and is in close proximity to the Grade II listed Yewbarrow Terrace.

Working closely with the local authority planning and conservation officers we developed a contemporary architectural language which is grounded in the local vernacular and responds to the site’s unique parkland setting and aligns with the Grange Over Sands Design Guide.

A public consultation event, attended by over 70 local residents was held in the town centre at which the scheme was well received.

Following a Places Matter review the scheme was granted permission in July 2024.

The Design Process

Following a design competition, OMI Architects was selected by South Lakes Housing (SLH) to redevelop the Yewbarrow site in Grange-over-Sands. The proposal aims to create a high-quality, sustainable residential development that integrates with the surrounding landscape while respecting the site's historical and architectural significance.

Site and History
Located within the GoS Central Conservation Area, the site occupies an elevated position overlooking Morecambe Bay. The original Yewbarrow Lodge Estate, established in 1832, underwent significant changes, including damage during WWII and eventual demolition in 1988. The current lodge, built in 1991 and closed in 2020, is unsuitable for modern family living and will be demolished along with a garage/store structure.

Concept and Design Approach
The development is designed to integrate seamlessly with its historic and natural context while enhancing accessibility and community connectivity. The scheme replaces the existing lodge with smaller-scale, sensitively designed buildings that reflect local architectural character through expressed gables, natural stone, and slate roofs. A re-routed access road with a gentler gradient improves site navigation, while a central communal space, inspired by Italian hill towns, fosters interaction.

Proposed Development
The scheme includes eighteen new dwellings— nine houses and nine apartments—bringing the estate’s total to 36. The design prioritises dual-aspect homes, generous terraces, and pedestrian-friendly pathways, creating a vibrant neighbourhood that harmonises with the landscape and promotes a sense of place for new and existing residents. Sustainability is central, incorporating air-source heat pumps, permeable paving, and SuDS for water management. Stone and slate from the existing Yewbarrow Lodge will be reused in gabion retaining structures and roofing for the new buildings. Excavated material from site modifications will be repurposed to create a consistent base level, minimizing waste and reducing off-site disposal.

Accessibility and Community Spaces
The design prioritises pedestrian and cyclist-friendly routes, enhanced parking (49 spaces), and well-integrated recycling and bin storage. The landscape strategy includes communal gardens and improved biodiversity.

By addressing accessibility, sustainability, and architectural integration, the proposal creates a modern, respectful, and connected residential community.

Key Features

Developer: South Lakes Housing (SLH), designed by OMI Architects.
Project Goal: High-quality, sustainable residential development with affordable housing.
Site: Located in Grange-over-Sands, within a conservation area.
Existing Buildings: Yewbarrow Lodge (to be demolished) and other structures.
Design Concept: Smaller-scale buildings, improved connectivity/permeability, and communal spaces.
Materials: Reuse of stone and slate from existing structures.
Sustainability: Air source heat pumps, SuDS, and energy-efficient design.
Access & Parking: Improved roads, 49 parking spaces, and cycle storage.
Housing Mix: 18 new dwellings, bringing the total to 36.

Download PDF

Scheme Information

Type

  • Courtyard House
  • Multi-Aspect Apartments
  • Innovative House Types
  • Detached
  • Terrace

Size

  • Medium density

Cost/ownership

  • Affordable
  • Shared Ownership
  • Mixed Tenure

Planning

  • Community Consultation

Construction/Design

  • Contemporary Design
  • Vernacular

Outdoor areas

  • Private Terraces
  • Roof Gardens
  • Roof Terrace
  • Outside Terrace
  • Biodiversity
  • Garden

Surrounding Area

  • Landscape
  • Communal Spaces

Sustainability

The Yewbarrow development incorporates several key sustainable design principles aimed at reducing environmental impact and enhancing long-term efficiency: 1. Material Reuse & Waste Reduction • The existing Yewbarrow Lodge will be demolished, but materials such as stone and slate will be reused in gabion retaining structures and roofing for new buildings. • Excavated material from site modifications will be repurposed to create a consistent base level, minimizing waste and reducing off-site disposal. 2. Energy Efficiency & Low Carbon Technologies • A fabric-first approach ensures high levels of insulation and airtightness to minimize energy demand. • Air-source heat pumps will be installed to provide low-carbon heating, reducing reliance on fossil fuels. • Photovoltaic (solar) panels will be integrated into roofs to generate renewable electricity. 3. Sustainable Drainage & Water Management • SuDS (Sustainable Drainage Systems) will be implemented to control surface water runoff and reduce flood risk. • Permeable paving in communal areas will allow rainwater to naturally infiltrate the ground rather than overwhelming drainage systems. 4. Sustainable Transport & Accessibility • Improved pedestrian and cycle connectivity through re-routed roads and pathways reduces reliance on cars. • Cycle storage is provided for all homes to encourage active travel. • The number of parking spaces is increased while ensuring efficient land use (49 spaces for 36 dwellings). 5. Biodiversity & Landscape Integration • Native planting and non-edible fruit trees will enhance local biodiversity and provide a greener living environment. • The landscape design promotes a strong connection between the built environment and surrounding parkland, supporting ecological integration. Overall, the project prioritises resource efficiency, renewable energy, sustainable water management, and eco-friendly transport, making it a forward-thinking and environmentally responsible development.
Next
Previous